Sketchplanations
Sketchplanations podcast photo of Rob Bell, Tom Pellereau and Jono Hey
Prefer to listen?
🎉 Help keep Sketchplanations ad-free by supporting me
Big Ideas Little Pictures by Jono Hey

This is such a cool book.

The range of Jono's knowledge is astounding, and so is his ability to digest complex ideas into deceptively simple drawings.

You'll learn something on every page—and be entertained too.

— Bill Gates

Big Ideas Little Pictures

Explaining the world one sketch at a time

Sketchplanations in a book! And now an eBook too. In this 288-page collection, Jono Hey collects together over 130 inspiring, funny and relatable sketches about life. Combining existing and new topics, Big Ideas Little Pictures is a perfect gift of the wisdom and joy of Sketchplanations. Pop it on the table and start having great conversations about ideas.

Order Big Ideas Little Pictures

Buy on Amazon

Redirects to your local Amazon store

Order an exclusive signed copy
from my friends at South Kensington Books in London

Or order from your local bookshop because we 💙 them.

I earn from qualifying Amazon purchases through links on this site, including the Amazon button above.

What Will You Find Inside?

10 sections, 130+ ideas

Big Ideas Little Pictures brings together over 130 sketches across science, psychology, nature, technology, and everyday life. Here's a glimpse of what you'll find inside:

Table of Contents

Explore everything from cloud shapes to cognitive biases, from paradoxes to practical tips. These ten sections span the profound, the peculiar, and the playful — all explained in simple, memorable sketches.

  1. Nature's Nuances

    Including: The Coastline Paradox, Autumn Leaves, The Golden Ratio, The Moon Illusion...

  2. Health and Healing

    Including: The Swiss Cheese Model, Microadventures, The Three-Day Effect, Sleep Basics...

  3. There's a Word for That

    Including: Schadenfreude, Emotional Hot Potato, Tsundoku, Yak shaving...

  4. Motivation and Inspiration

    Including: The Road to Success, Motivation Doesn't Last, 9,000 shots, Sleeping with a Mosquito...

  5. Blind Spots

    Including: You Get What You Measure, The Paradox of Choice, The Spotlight Effect, Chesterton's Fence...

  6. Starry-Eyed Surprises

    Including: Atmospheric Perspective, Phases of the Moon, Know Your Clouds, The Potato Radius...

  7. Business and Bytes

    Including: The Traveling Salesman Problem, Starting a Company, The Trust Equation, The Long Nose of Innovation...

  8. Thinking About Thinking

    Including: Thesis, Antithesis, Synthesis, Solvitur Ambulando, The BS Asymmetry Principle, The 20/40/60 Rule...

  9. The Big Picture

    Including: Solar System Sizes, The Overview Effect, The Continental Axis Hypothesis, 1.5 Billion Heartbeats...

  10. Life's Little Manuals

    Including: How to Win at Monopoly, Skip Rocks Like a Pro, The 60-30-10 Color Rule, The Awkwardness Vortex...

…and much, much more.

The perfect coffee table book for sparking great conversations.

Sample pages

A peek inside. Tap to zoom in.

1 Table Of Contents - Book page spread from Big Ideas Little Pictures
2 Table Of Contents - Book page spread from Big Ideas Little Pictures
Coastline Paradox - Book page spread from Big Ideas Little Pictures
Tsundoku - Book page spread from Big Ideas Little Pictures
How To Win At Monopoly - Book page spread from Big Ideas Little Pictures
Swiss Cheese Model - Book page spread from Big Ideas Little Pictures
Awkwardness Vortex - Book page spread from Big Ideas Little Pictures
Days Of The Week - Book page spread from Big Ideas Little Pictures
Flow - Book page spread from Big Ideas Little Pictures
Goldilocks Zone - Book page spread from Big Ideas Little Pictures
Hope - Book page spread from Big Ideas Little Pictures
RACI - Book page spread from Big Ideas Little Pictures
Seasons - Book page spread from Big Ideas Little Pictures
Solar System Sizes - Book page spread from Big Ideas Little Pictures
Starting A Company - Book page spread from Big Ideas Little Pictures
Survivorship Bias - Book page spread from Big Ideas Little Pictures
The Doppler Effect - Book page spread from Big Ideas Little Pictures
The Paradox Of Choice - Book page spread from Big Ideas Little Pictures
The Potato Radius - Book page spread from Big Ideas Little Pictures

Video previews

Praise for Big Ideas Little Pictures

"I'm an enormous fan of the wonderful way Jono's sketches bring scientific insights to life for a wide audience."
Katy Milkman
Professor at the Wharton School of the University of Pennsylvania and author of the international bestseller How to Change
"Jono's superpower is the ability to break down complex concepts into digestible, visually appealing explanations."
Mark Frauenfelder
Founder of Boing Boing, Recomendo, Make and Wired magazines
"Big Ideas, Little Pictures is a magical collection of ideas, concepts, and wisdom—some that I've wondered about and others I've never thought about before—presented in a clear visual way that makes Jono's sketchplanations a joy to read, reference, and share. It's a fantastic book!"
Mike Rohde
Bestselling author of The Sketchnote Handbook and illustrator of REWORK

As the world becomes more complex and fraught, the more we need clear and honest pictures to show us a better way. In his marvellous book, Big Ideas, Little Pictures, Jono Hey gives us the pictures we need.

Whether exploring the size of the universe, unpacking the paradox of choice, or illuminating the pure joy of the Golden Ratio, Jono's brilliant sketches make everything make more sense.

I can't think of a better gift for my mind, and yours.

Dan Roam
International bestselling author of The Back of the Napkin, and Draw To Win
"Jono Hey's Big Ideas Little Pictures is the kind of book that I want to devour all at once, with his brilliantly efficient illustrations breaking down complex ideas—but that I make myself ration to a few pages per day, to give myself time to absorb everything. Either way, it's the best bet I have to make myself seem more interesting as a dinner party guest."
Brendan Leonard
Creator at Semi-rad and author of Make It: 50 Myths and Truths About Creating
"Brilliant! It distills a variety of complex and profound ideas into simple to understand and beautifully drawn sketches."
Richard Shotton
Author of The Choice Factory
"I've loved following Sketchplanations for years. And finally, Jono has brought it all together in this wonderful book. Keep a copy in your home and show it to everyone who comes over."
Trenton Moss
Bestselling author of Human Powered and Founder of Team Sterka

Big Ideas, Little Pictures by Jono Hey is a beautiful and powerful book at the same time. On each page, Jono visualises a complex concept into a clear, engaging little drawing. His sketches don't just simplify ideas, they bring them to life and make them understandable at a glance.

This large collection of concepts, scientific findings and interesting frameworks is delightful and a real testament to the power of communicating through simple visuals. This body of work is even more impressive as it was created by Jono over years of drawing one concept per week.

As a fellow visual thinker I'm in love with this wonderful book. It's a joy to dive in at any page, to get drawn in by the pictures and to learn a new fact with every turn of the page.

Eva-Lotta Lamm
Designer and Visual Thinker

I love this book. It will delight adults, fascinate children and help us all to grasp important ideas.

Want to understand the four horsemen of relationship apocalypse? Or different types of phishing? Or the ten essentials for wilderness safety? Jono Hey's explanations are brief and clear – but it's his pictures that stick in your head. Every time you turn over a page, there's something new. I can't wait to try out the instructions for skipping rocks like a pro and taking better photographs—and I'll certainly take up the Dracula sneeze.

I meant to read it slowly, a few pages at a time, but it's such fun that I kept thinking, Just one more picture and finished it in one sitting. I'm looking forward to re-reading it very soon.

Gillian Cross
Multi-award-winning children's book author
"Jono's delightful book is a fantastic blend of text and visuals, making the topics easy to understand and remember. I found myself eager to turn each page, learning things I had never known before. I love this book and recommend it to anyone looking to enrich their knowledge at super speed with some creativity and fun."
Jason Barron
Author of The Visual MBA
"I resent our bedroom looking so messy in the tsundoku sketch."
Dad

FAQ

Can I order in a different country?

Yes. The Amazon button redirects to your local Amazon store automatically. If you're in the US, UK, Australia, or another region with links on this page, you'll also see local bookstores for your area.

Don't see your country? Email me at jono.hey@gmail.com — it helps us prioritise distribution where it's needed most.

Is there an eBook version?

Yes! As of May 2025 there's now an eBook of Big Ideas Little Pictures.

It's great for quick reference, easier to carry on your commute or a flight, and a decent amount cheaper. It's packed with nearly 150 bite-sized sketches—perfect for dipping in when you need an idea, a shift in perspective, or a smile.

You can buy it via the order links above — the Amazon button often includes the Kindle edition too, depending on your store. It's also on B&N, Apple Books, Kobo, and others.

Do you have photos or images I can use to share?

Yes. Please use images in the basic media kit. Let me know if it's missing something.

Is it available in other languages?

Not yet. Do let me know if you'd like it in another language—it always helps to gauge demand.

What is the ISBN for Big Ideas Little Pictures?

The ISBN-13 is 978-1956403572

ISBN-10 is 1956403574

What's the picture on the cover?

The picture is my own version of Hokusai's remarkable The Great Wave off Kanagawa or just the Great Wave. I once saw the real thing at the British Museum in London. It's small, but few pictures captivate the way it does. Hokusai's wave evolved a lot throughout his life.

Buy a print of the Sketchplanations Wave

Got another question? Please contact me

I'm at: jono.hey@gmail.com

Why a book?

I started making sketchplanations in 2013 by sketching them in actual books. While putting the sketches online has helped them reach so many more people there's something about browsing through the sketches in a book, phones and laptops away, that makes it the best way to experience it.

Which sketches to include was a challenge. I'm really happy that I've selected sketches that will teach you a new thing or two about the world, make you think, inspire you and make you smile. In the process, I added a host of sketches for topics I'd always wanted to cover ranging from How to Win at Monopoly to the Basics of a Good Night's Sleep.

Buy Me A Coffee